Forgan Smith Building (1) construction work

4 Jan 2019

There will be construction works to the east stairwell from levels 2 to 3 of the Forgan Smith Building (1) to facilitate the repair of artwork.

When

  • Start: Tuesday 8 January 2019
  • Finish: Friday 8 February 2019

Work details

The mural in the stairwell requires conservation work to fix damaged artworks therefore a permanent scaffold is required for this period of time.

As the scaffolding will be constructed permanently for the duration of the works, levels 2 to 3 of this stairwell will only be used in cases of emergencies.

Contact

Stuart Coppell, Client Facility Coordinator

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Latest