Goddard Building (8) construction works

11 Jul 2019

There will be construction works occurring in the Goddard Building (8) to allow for the removal of the existing stair lift and installation of a new replacement stair lift.

Affected areas

  • During the replacement of the stair lift works there will be no access to level 3 to level 4 via stair 4194 as indicated on the map (PDF, 248.4 KB).

When

  • Start: Monday 22 July 2019
  • Finish Monday 29 July 2019
  • Times: 5am to 5pm

Work Details

  • During the replacement of the incline platform lift works there will be no access to from level 3 to Level 4 via stair 4194. 
  • All noisy works and works that cause vibration will be undertaken early in the morning before 9am or after hours, as agreed with stakeholders. 
  • Construction materials will be transported from the nominated lay down area in Mansfield Place via the pathway between the Goddard (8) and Michie (9) buildings and then through the entrance from the Great Court. 
  • All waste removal and material movements will occur outside business hours of the Goddard (8) building. 

Contact

Fraser Stevenson  Project Manager:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Latest