Main UQ lake pedestrian bridge closure

5 Nov 2019

There will be a closure to the pedestrian link walkway bridge across the main UQ lake to facilitate the removal of seating and the restoration of the timber walkway.

Walkway signage will be in place showing alternate routes around this area for the duration of the works as per the attached drawing. Please obey all signage and barriers as directed to ensure personal safety and the safety of the workers.

Affected Areas

When

  • Start: Saturday 23 November 2019 – 6am
  • Finish: Monday 25 November 2019 – 6am

Contact

Ron Tyler, Contracts Coordinator

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Latest