Advanced Engineering Building (49) DI water shutdown

23 Jan 2020

There will be a shutdown to the DI (demineralised) water system of the Advanced Engineering Building (49) to sanitise the DI water delivery lines throughout the building.

When

  • Start: Thursday 30 January 2020
  • Finish: Friday 31 January 2020
  • Times: 7am to 5pm

Work details

  • Anyone requiring DI water during the shutdown, please contact the CFM with the room number before 30 January and the contractor will supply water with a full drum of DI water (25 litres).

Contact

Craig Schaumburg, Client Facility Manager (CFM):

We apologise for the inconvenience this may cause and thank you for your understanding during this time.