Please be advised there will be a crane lift on Jocks Road to remove an old air conditioning unit from Zelman Cowen Building (51).
Affected Areas
- There will be limited vehicular access to Jocks Road from Staff House Road
When
- Start: Thursday 19 November 2020
- Finish: Thursday 19 November 2020
- Times: 5.30am to 7.30am
Work details
The crane set up will be between the Zelman Cowen and AEB buildings. Road access will be blocked from Staff House Road for this period.
Project details
This is part of a project to replace a failed air conditioning unit serving the Level 3 Library in Zelman Cowen.
Contact
Neil Brown, Senior Building Systems Engineer:
- Call: 07 3346 1270
- Email: n.brown@pf.uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.