Please be advised there will be a Power Shutdown at Hawken Engineering Bld (50), DB-5C & LP-501 install rcbo for new circuit.
Affected Areas:
- Bld 50, Level 5
When:
- Start: Friday, 4th December 2020
- Finish: Friday, 4th December 2020
- Times 5:00am to 6:00am
Contact:
James Tindall
- Call: 0423 404 036
- Email: James.tindall@ugllimited.com
Brody Lucas
- Call: 0413 778 409
- Email: Brody.lucas@ugllimted.com
We apologise for the inconvenience this may cause and thank you for your understanding during this time.