Power Shutdown at Hawken Engineering Bld (50)

2 Dec 2020

Please be advised there will be a Power Shutdown at Hawken Engineering Bld (50), DB-5C & LP-501 install rcbo for new circuit.


Affected Areas

  • Bld 50, Level 5

When:

  • Start: Friday, 4th December 2020
  • Finish: Friday, 4th December 2020
  • Times 5:00am to 6:00am

Contact:

James Tindall

Brody Lucas

 

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest