Power shutdown (Hawken Building 50)

16 Dec 2020

Please be advised there will be a power shutdown to all of Hawken Building to replace the Main Switchboard.
 

Affected Areas

  • All Lights , Power, Comms and air conditioning in Hawken Building. Power will be off for about 8 days
     

NOTE: The following areas will have limited power for security, monitoring and essential equipment

  • Level 1 CMM Labs rooms L100 to L141
  • Library areas Level 2 to 5 rooms L201 to L214, L293 to l295, L301 to L309, L401 to L412, L501 to L529
  • S Block Level 3 to 5 rooms S311 to S322, S405A to S420, S507 to S513
  • C Block Levels 1 to 4 rooms C101 to C110, C201 to C204, C301 to C306, C401 to C405
  • T Block Levels 2 & 3 rooms N201 to N204, N301 to N309

When

  • Start: Sunday, 27 December 2020
  • Finish: Sunday, 3 January 2021
  • Times: 6.00am to 5.00pm


Work details

Installation of new Main Switchboard in substation 3 Hawken Building


Project details

Hawken Building Sub 3 Main Switchboard Replacement


Contact

Terence Cronk, Electrical Infrastructure Officer:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest