Power Shutdown at Otto (81), Lvl 6

4 Mar 2021

Please be advised there will be a Power Shutdown at Otto Hirschfeld (81). DB-6A/6AE to install an RCD installed in room 612.

Affected Areas:

  • Otto Hirschfeld (81), level 6 rooms 611,611A,612,612A,612B and 612C

When

  • Start: Friday, 12th March 2021
  • Finish: Friday, 12th March 2021
  • Times 6am to 7am

Contact

James Tindall

Brody Lucas

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest