Please be advised of a planned road closure of Staff House Road. The road will be closed to all vehicular traffic.
This closure is to enable the safe crane lifting of equipment onto the roof of General Purpose South (78).
Affected Areas
- All buildings on Staff House Road
- GP South (78)
- Sir James Foots (47A)
- Advanced Engineering (49)
- Hawken Engineering (50)
- Mansergh Shaw (45)
- Selman Cowen (51)
- Andrew N. Liveris (46)
- Prentice (42)
- Staff House (41)
- Physics Annexe (6)
- Learning Innovation Building (17)
- Bookshop (4) – Wordsmiths, Ezymart, School Locker.
- Global Change Institute (20)
- Steele (3)
- Main Refectory (21B)
When:
- Start Tuesday 28 September
- End: Tuesday 28 September
- When: 6:00am to 4:00pm
Contact
Brad Mortimer – Project Manager
- Mobile: 0407 832 554
- Email: brad.mortimer@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your patience during this time.
For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.