AC Isolation at Otto Hirschfield (81)

19 Oct 2021

There will be an isolation of the air conditioning to Otto Hirschfeld  (81), level 2.

This will be to connect power to a new air conditioning system serving room 219.

Affected Areas

  • Otto Hirschfeld (81), level 2
    • Level 2 GAF rooms for the whole shutdown period
    • Level 1 Aquarium and Comms room will lose air conditioning for 15 minutes only

When

  • Start: Wednesday, 20 October 2021
  • Finish: Wednesday, 20 October 2021
  • Times: 6.00am to 9.00am

Work details

  • The mechanical services board feeding the air conditioning system will be shutdown.

Project details

  • This is part of a project to replace the end-of-life air conditioning system serving the level 2 prosection room in Otto Hirschfeld.
  • The new system will deliver the required room conditions for this critical space and has been designed to minimise energy consumption.

Contact

Neil Brown, Senior Building Systems Engineer:

We apologise for the inconvenience this may cause and thank you for your patience during this time.

For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest