Please be advised, there will be a power shut down in Hawken (50) for the replacement of the Electrical Distribution Board.
Affected Areas
- Hawken Engineering (50)
- All light and power in Room C104
When
- Start: Saturday, 16 October 2021
- Finish: Sunday, 17 October 2021
- Times: 6.30am to 4.00pm
Work details
- Replace Distribution Board 1I
Contact
Terence Cronk, Electrical Infrastructure Officer:
- Call: 0401 148 110
- Email: t.cronk@pf.uq.edu.au
We apologise for the inconvenience this may cause and thank you for your patience during this time.
For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.