Repair Works on Staff House Road

27 Oct 2021

Please be advised, there will be asphalt repair works to the share pedestrian zones on Staff house road on Saturday 13th November.

Affected Areas

  • Staff House Road
    • 5 x locations on Staff House Road between the intersection of College Road to outside the Zelman Cowen Building

When

  • Start: Saturday, 13 November 2021
  • Finish: Saturday, 13 November 2021
  • Times: 9:00am to 12:00pm

Work details

  • Repairs are very minor however located in the middle of the road in 5 x separate locations
  • The contractor will use localised traffic management to assist with traffic and pedestrian flow, repaired areas will be safe to walk and drive on shortly after completion.

Project details

  • Once these works are completed, a separate company will stencil the patched areas, then another contractor will rejuvenate the line marking

Contact

Russell Lobley, Asset Condition Officer

We apologise for the inconvenience this may cause and thank you for your patience during this time.

For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest