Power shutdown at Long Pocket Campus

14 Dec 2021

Please be advised of a planned power outage at Long Pocket Campus.

Affected

  • Pandanus (1022)
  • Elkhorn (1024)
  • Dianella (1021)
  • Rosewood/Headhouse (1025)

When

  • Start: Thursday 16th December
  • End: Thursday 16th December
  • When: 6:30am to 7:00am & 7:30-8:00am

More details

  • There will be a short interruption to power supply to enable the installation and testing of a back-up generator at the Elkhorn Building
  • Outages are expect to last around 20mins whilst the generator turns on and off
  • Building occupants are advised to ensure any equipment is powered down prior to this shutdown.

Contact

Brad Mortimer – Project Manager

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest