Geotechnical works on Cooper Road and Staff House Road

19 Jan 2022

There will be a disruption for geotechnical testing (drilling with a 4WD mounted drill rig and service location using portable radar equipment) within the roadway of Cooper Road and Staff House Road for geotechnical investigation in the area.

Affected Areas

  • Cooper Road and Staff House Road, St Lucia Campus

When (Underground Utility Marking)

  • Start: Monday, 7 February 2022
  • Finish: Monday, 7 February 2022
  • Times: 7.00am to 3.00pm

When (Geotechnical Drilling)

  • Start: Monday, 7 February 2022
  • Finish: Monday, 7 February 2022
  • Times: 7.00am to 3.00pm

Work details

Nearby underground utilities will be scanned with portable radar equipment and marked on the surface.

Geotechnical investigation will require drilling with a 4WD mounted drill rig within the roadway with samples collected throughout.

Project details

Three boreholes will be drilled at marked locations throughout Cooper Road, and Five boreholes will be drilled at marked locations throughout Staff House Road.
There will be some interruption and minor noise throughout the day.

Contact

John Hegerty, Project Officer (Infrastructure):

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest