Road closure for link marking at Campbell place

17 Feb 2022

Please be advised there will be minor road works to Campbell Place at St Lucia Campus. The works will consist of shared zone and speed bump line marking  

Affected Areas

When

  • Start: Saturday, 19 February 2022
  • Finish: Saturday, 19 February 2022
  • Times: 7.00am to 2.00pm

Work details

  • The contractor will block off the full width of the road at each location marked on the attached drawing.
  • Sufficient pathways for pedestrian movement will be maintained.
  • Please be mindful of wet paints and changed traffic conditions. Please be mindful of parking close to work areas where possible to avoid potential paint overspray

Project details

  • St Lucia pedestrian line marking

Contact

Russell Lobley, Principal, Asset Condition:

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest