Please be advised, Cooper Road will be closed to allow for line marking
Affected Areas
- Cooper Road
- See attached plan which detail the works area
When
- Start: Saturday, 12 March 2022
- Finish: Saturday, 12 march 2022
- Times: 8.30am to 3.30pm approx.
Work details
- Shared zone and speed bump line marking
- Works will commence at 8.30am, the contractor will block off the full width of the road at each location marked on the attached drawing.
- Sufficient pathways for pedestrian movement will be maintained in the central area around Liveris and Hawken Buildings.
- Please be mindful of wet paints and changed traffic conditions.
- Please be mindful of parking close to work areas where possible to avoid potential paint overspray
Project details
- St Lucia pedestrian line marking
Contact
Russell Lobley, Principal, Asset Condition:
- Call: 0404278761
- Email: r.lobley@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.