Electrical shutdown to Axon (47)

17 Mar 2022

Please be advised, there will be an electrical shutdown to the entire building.

The shutdown period will be 1 hour. All electrical operations will return to normal following the shutdown.

Affected Areas

  • Axon Building (47)

When

  • Start: Saturday, 19 March 2022
  • Finish: Saturday, 19 March 2022
  • Times: 6.30am to 7.30am

Work details

  • The works are required to be undertaken to access the electrical distribution board safely in order to install temporary power provisions/access to the stage two works of the cladding replacement project located within the courtyard.

Project details

  • Sir James Foots & Axon cladding replacement project.

Contact

Casey Fredrickson, Project Manager (Infrastructure):

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.