Fire & HVAC testing across ST Lucia

22 Apr 2022

There will be a Disruption to the Air Conditioning to the Whole of Buildings to allow Fire/HVAC interface testing.

Affected Areas

  • Parnell (7)
  • Sir Llew Edwards (14)
  • Connell (26)
  • Human Performance Laboratories (26A)
  • Human Movement Studies Building(26B)
  • Colin Clark (39)
  • Prentice (42)
  • Mansergh Shaw (45)
  • Axon (47)
  • Sir James Foots (47A)
  • Sir William Macgregor (64)
  • Cumbrae-Stewart (72)
  • Don Nicklin (74)
  • Therapies Annexe (84A)
  • Therapies (84)
  • Biological Sciences Library (94)

When

Work details

  • The Design of the Air Condition system is to stop during a fire alarm.
  • Test time should be off no longer than 1 hour per test with a 15 min on period between tests.
  • With the milder condition expected, the impact will be minimal. 
  • The system will return to normal after testing.

Contact

Michael Crowley, Technical Support:

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest