Scissor lift installation at UQ Centre (27A)

20 Apr 2022

Please be advised, works will be commencing on the UQ Centre roof to repair leaks. 

Affected Areas

When

  • Start: Friday 22 April 2022
  • Finish: Friday 22 April 2022
  • Times: 6:00am to 5:00pm

Work details

  • Repair of UQ Centre roof leaks
  • Please be advised that a scissor lift is required to gain access to the box gutter and lift materials onto the roof.
  • The scissor lift will be position at the entrance to the UQ centre undercover carpark, barricades will be set up to ensure space for cars to pass at all times.
  • Noise from these works will not be disruptive to any activities occurring in the UQ Centre.  
  • These works are separate to the ongoing internal repair works running concurrently.

Contact

Jason Wright - Project Officer

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest