Please be advised, there will be condition testing to the outer walls of Sir William McGregor (64) for Façade works.
Affected Areas
- Sir William McGregor (64)
- See attached plan which detail the works area
When
- Start: Monday, 23 May 2022
- Finish: Monday, 23 May 2022
- Times: 8:00am to 4:00pm
Work details
- Works will commence at 8:00am, weather pending
- Voltin, the works contractor will undertake high resolution thermal imagery of the external façade of the building.
- The images do not see beyond the windows, walls or screens in any way.
- Imagery is taken by three methods - camera unit lowered from the roof parapet on a crane, ground-controlled camera on a pole, or by drone if access is unsafe or difficult.
- Areas underneath the works zone will be temporarily cordoned off, safe access and egress will be maintained for all building users at all times.
Project details
- St Lucia building façade audit programme
Contact
Russell Lobley, Principal, Asset Condition:
- Call: 0404278761
- Email: r.lobley@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.