Disruption to AC at Long Pocket

30 May 2022

There will be a Disruption to the Air Conditioning to the Whole of Buildings to allow Fire/HVAC interface testing.

Affected Areas

  • Acacia Building (1015)
  • Banksia Building(1016)
  • Hibiscus Building (1017
  • Foxtail Building (1019)
  • Dianella Building (1021)
  • Yellow-Box Building (1021B)
  • Plant Pandanus Building (1022)
  • Cycad Building (1018)

When

  • Start: Friday, 10 June 2022
  • Finish: Friday, 10 June 2022
  • Times: 7:00am to 3:00pm

Work details

  • This is a mandatory annual test.
  • The Design of the Air Condition system is to stop during a fire alarm.
  • Technicians will need to inspect the units to ensure they act as designed.
  • Each building’s system should only be off for a maximum of 1 hour during this time.
  • An announcement will be made at the commencement of testing.
  • With the milder condition expected, the impact will be minimal. 
  • The system will return to normal after testing.

Contact

Michael Crowley, Technical Support:

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest