| Disruption to AC at PACE (870)

30 May 2022

There will be a Disruption to the Air Conditioning to the Whole of Buildings to allow Fire/HVAC interface testing

Affected Areas

  • PACE (870)

When

  • Start: Tuesday, 7 June 2022
  • Finish: Tuesday, 7 June 2022
  • Times: 6:30am to 9:00am

Work details

  • This is a mandatory annual test
  • The Design of the Air Condition system is to stop during a fire alarm. Technicians will need to inspect the units to ensure they act as designed. The systems should only be off for a maximum of 1 hour during this time.
  • Fire doors may close during test.
  • The impact will be minimal. 
  • The system will return to normal after testing.
  • There will be no tones during tests.

Contact

Michael Crowley, Technical Support:

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.