Disruption to AC at St Lucia

30 May 2022

There will be a Disruption to the Air Conditioning to the Whole of Buildings to allow Fire/HVAC interface testing.

Affected Areas

  • Queensland Bioscience Prescient (80)
  • Steel Building (3)
  • Advance Engineering Building  (49)

When

  • Start: Wednesday, 8 June 2022
  • Finish: Wednesday, 8 June 2022
  • Times: 7:00am to 12:00pm

Work details

  • This is a mandatory 3 monthly test.
  • Each building’s system should only be off for a maximum of 0.5 hour during this time.
  • An announcement will be made at the commencement of testing.
  • With the milder condition expected, the impact will be minimal. 
  • The system will return to normal after testing.

Contact

Michael Crowley, Technical Support:

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest