Marquee Installation near Building (53)

25 May 2022

There will be construction works to the entrance area to building(53) when accessed from Sir William MacGregor Drive in the grassed area to allow for the construction of a large marquee.

Affected Areas

  • Entrance area to building(53) when accessed from Sir William MacGregor Drive

When

  • Start: Thursday, 26 May 2022
  • Finish: Monday 28 June 2022
  • Times: 7:00am to 4:00pm

Work details

  • Construction works will be confined to within a site fence currently being erected.
  • Delivery trucks will be contained within the perimeter of the site, where no traffic disruption is expected.
  • Earthworks will be carried out post after 7am and will continue until the road base has been completed by week ending 3 June 2022;
  • thereafter, minimal noise is expected whilst the marquee is being erected. Access by essential service providers will be permissible throughout the project.

Project details

  • Road base crusher dust will be used as ground cover for the marquee over approximately 500 SQM.
  • The construction of a large marquee 15 m x 20 m (see attached) and placement of a 40’ container for storage purposes.

Contact

Roger Goodwin, Transitions Project Manager:

We apologise for the inconvenience this may cause and thank you for your patience during this time.  For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.