power shutdown at Advanced Eng (49)

13 May 2022

Please be advised, there will be a shutdown to Advanced Engineering (49), level 5.

Affected Areas

  • Advanced Engineering (49), Level 5, DB-5C, Lab areas

When

  • Start: Wednesday 18May 2022
  • Finish: Wednesday 18 May 2022
  • Times: 6:00am to 8:00am

Work details

  • Shutdown required to DB 5C to install 7x RCDs for outstanding electrical works.

Contact

James Tindall

Luke Cahill

We apologise for the inconvenience this may cause and thank you for your patience during this time. For more information on campus shutdowns, disruptions and road closures please refer to the Property and Facilities Division Road and buildings works page.

Questions and feedback:

PF Assist
Property and Facilities

Latest