Please be advised, there will be a shutdown in Sir James Foots (47A) for RCD works.

Affected Areas

Sir James Foots (47A), Level 6, room 611

When

  • Start: Friday 13May 2022
  • Finish: Friday 13 May 2022
  • Times: 6:00am to 7:00am

Work details

  • shutdown to DB-612A to replace an RCD that failed during routine testing.  