Fire/HVAC Testing: Gehrmann (60)

14 Sep 2022

There will be a disruption to the air conditioning in Gehrmann (60) to allow Fire/HVAC interface testing.

Affected Areas

When

  • Start: Monday, 19 September 2022
  • Finish: Monday, 19 September 2022
  • Times: 7:00am to 9:00am

Work Details

The design of the air condition system is to stop during a fire alarm is active on a Floor. When the fire alarm is not active on the floor the AC will continue to run. Test time should be off no longer than 1 hour per test with a 15-minute on period between tests. With the milder condition expected, the impact will be minimal.  The system will return to normal after testing.

Contact

Dale Coulson, Service Technical:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

 