Please be advised, there will be disruptions to the air conditioning on the buildings affected below, to allow Fire/HVAC interface testing.
Affected Areas:
- Queensland Bioscience Precinct (80)
- Steele Building (3)
- Advanced Engineering Building (49)
- Australian Institute for Bioengineering and Nanotechnology (75)
When
- Start: Monday, 19 September 2022
- Finish: Monday, 19 September 2022
- Times: 9:00am to 12:00pm
Work details
This is a mandatory quarterly test. Each building’s system should only be off for a maximum of 30 minutes. An announcement will be made at the commencement of testing. With the milder condition expected, the impact will be minimal. The system will return to normal after testing.
Contact
Dale Coulson, Service Technician:
- Call: 0456 414 605
- Email: dcoulson@agcoombs.com.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.