Fire/HVAC Testing: Various Locations at Gatton

16 Sep 2022

There will be a Disruption to the Air Conditioning to the Whole of Buildings to allow Fire/HVAC interface testing. Please refer to the table below.

WhenAffected Areas

Monday, 26 September 2022

Times: 7:00 to 3:00

  • Clinical Studies Building (8179 )
  • Main Lecture Theatre (8178 )
  • Agricultural Mechanisation Building (8115 )
  • Plant Industries Building (8111)

Tuesday, 27 September 2022

Times: 7:00 to 3:00

  • Veterinary Sciences (8114)
  • John Mahon Stage (8105)
  • John Mahon Stage II (8106)
  • Sub Station (8167)

Wednesday, 28 September 2022

Times: 7:00 to 3:00

  • UQ Veterinary Medical Centre (8156)
  • Animal Industries (8103)
  • N.W. Briton Admin Building (8101)
  • J.K. Murray Library (8102)

Thursday, 29 September 2022

Times: 7:00 to 3:00

  • QASP Central Support (8360)
  • Animal Metabolism Facilities (8361)
  • Library Warehouse (8248)
  • H.P. Hamon Centre (8255)

The Design of the Air Condition system is to stop during a fire alarm is active on a Floor. When the fire alarm is not active on the floor the AC will continue to run.
Test time should be off no longer than 1 hour per test with a 15 min on period between tests.
With the milder condition expected, the impact will be minimal.  
The system will return to normal after testing.

Contact

Dale Coulson, Service Technical:

  • Call: 0456414605
  • Email: dcoulson@agcoombs.com.au

We apologise for the inconvenience this may cause and thank you for your understanding during this time.