Construction works for the UQ Lakes Renewal and Amphitheatre Upgrade Project are progressing with mass soil mixing continuing in the lake and structural and civil works continuing in the Amphitheatre.
There are delays expected due to the previous and expected wet weather.

Please refer to the attached image for impacts to pathways, roads, and bicycle lanes.

This project is expected to be complete in April 2023, a timeline can be found on the project website.

Affected Areas

Roads, Footpaths and Cycleways:

  • Pedestrian and cyclist pathways are closed for the entirety of the works. Please refer to attached image for an alternative route.

  • Road closure at the corner of College Road & Thynne Road will be in place until the end of the project.
    Access to Colleges via College Road and access to P11 via Thynne Road.

  • Traffic control will be in place on Jocks Road & College Road to manage vehicle movements.

  • Increased construction vehicle movements on College Rd to commence from 21 September 2022 (weather dependant) with upwards of 50 truck deliveries expected per day.
    This is anticipated to continue until early November for both the cut and fill and clay liner works.

  • These deliveries will use the site access gate along College Road (opposite the Women's College) and will require a partial closure of College Road, reducing the road to contraflow under the supervision of Traffic Control (refer image 1 below). This may cause some delays.

Noise & Odour:

  • The UQ neighbourhood / community can expect a level of odour to become present as the lake continues being stabilised.

  • Clearing of final tree and mulching scheduled for the first week of October (4 – 7 October). Expected increased noise levels during this period.

The UQ neighbourhood / community can expect an increased level of noise associated with the truck deliveries commencing from 21 September 2022.

Work Details

19 September 2022 – 25 September 2022

  • Lake Works

    • shallow mixing of soil within the lake; and

    • imported clay deliveries commencing.

  • Amphitheatre Works

    • waterproofing, backfill & drainage to retaining walls; and

    • complete main staircase concrete walls.

26 September 2022 – 2 October 2022

  • Lake Works

    • shallow mixing of soil within the lake; and

    • imported clay deliveries continuing.

  • Amphitheatre Works

    • installation of stormwater, electrical and communications infrastructure; and

    • continue staircase and retaining wall works.

3 October 2022 – 9 October 2022

  • Lake Works

    • cut to fill of stabilised sediments within the lake; and

    • mulching of cleared trees & removal of 1 x tree.

  • Amphitheatre Works

    • continue electrical and communications infrastructure works; and

    • continue staircase and retaining wall works.

Project details

The iconic UQ lake and amphitheatre is being transformed into a self-sustaining ecosystem that offers habitat for wildlife and more opportunities for people to enjoy the area.
More information can be found on the
project website.

Contact

Casey Fredrickson, Project Manager (Infrastructure):

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest