There will be a noise disturbance to the Centre for Advanced Imaging Building (57) to allow alterations to rainwater tank system.
Affected Areas
Ground level rainwater tank.
When
- Start: Wednesday, 28 September 2022
- Finish: Wednesday, 28 September 2022
- Times: 7:00am – 9:00pm
Work details
Quoted works: alterations to rainwater tank system.
Project details
- Drain rain water tank.
- Pressure clean and flush tank.
- Run non-potable pipe from pump room to rainwater tank.
- Install mains water top-up.
- Service and commission existing pumps.
- Install rainwater filtration system (bag filter and UV) on outlet of pumps.
- Commission rainwater system.
- Clean up area.
Contact
Ethan Shaw, Plumber/Supervisor:
- Call: 0432 794 410
- Email: ethan@axisms.com.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.