Please be advised a mechanical contractor will take measurements of the mechanical chiller units in Foxtail (1019) as part of the Foxtail Materials Characterisation project. During these works, there will be minor disruptions to air-conditioning services in the building. The air-conditioning temperature could drop by 1 to 2 degrees for around 10 minutes. To avoid disruption to the building occupants, the contractor will undertake these works between 6am and 9am.
Affected area
When
- Start: Monday, 24 October 2022
- Finish: Monday, 24 October 2022
- Times: 6:00am to 9:00am (times are approximate)
Work details
- The control valve to the chilled water pipes will be opened to each system for 5 minutes maximum to allow measurements to be taken.
- As a result, there may be a slight decrease in air temperature for around 10 minutes following this work.
Project details
- Measurements of the building’s mechanical chiller units as part of the Foxtail Materials Characterisation project.
Contact
Kevin Park, Project Manager:
- Call: +61 400 009 276
- Email: k.park1@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.