AC Disruptions: Foxtail (1019)

19 Oct 2022

Please be advised a mechanical contractor will take measurements of the mechanical chiller units in Foxtail (1019) as part of the Foxtail Materials Characterisation project. During these works, there will be minor disruptions to air-conditioning services in the building. The air-conditioning temperature could drop by 1 to 2 degrees for around 10 minutes. To avoid disruption to the building occupants, the contractor will undertake these works between 6am and 9am.

Affected area

When

  • Start: Monday, 24 October 2022
  • Finish: Monday, 24 October 2022
  • Times: 6:00am to 9:00am (times are approximate)

Work details

  • The control valve to the chilled water pipes will be opened to each system for 5 minutes maximum to allow measurements to be taken.
  • As a result, there may be a slight decrease in air temperature for around 10 minutes following this work.

Project details

Contact

Kevin Park, Project Manager:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.