Please be advised there will be construction commencing on Monday 17 October 2022 for the refurbishment of the running track at St Lucia.

Affected areas 

When

  • Start: Monday 17 October 2022
  • Finish: Monday 22 May 2023
  • Times: 7:00am – 5:00pm (Monday to Friday)

Work details

These works consist of removing the wearing running track surface and replacing with a new surface and drainage systems. The works also extend to the areas for high jump, shot put, long jump and hammer throw cage. There is not expected to be any road closures or closures to footpaths around the playing field.

The works will also include:

  • Removal of the track surface and upgrade
  • Upgrade to the high jump, long jump, and shot-put areas
  • Upgrade to the hammer cage
  • Reconfiguring areas around the running track for better drainage
  • Installation of new drainage channels and repairs to some existing drainage
  • New line marking  