Please be advised there will be disruptions to the air conditioning to the whole of buildings to allow for Fire/HVAC interface testing.
Affected areas
- Admin Building 101
- Building 407
- John Hines (62)
- Chemistry (68)
- PACE (870)
When
- Start: Monday, 21 November 2022
- Finish: Monday, 21 November 2022
- Times: 6:00am to 2:00pm
Work details
The design of the air condition (AC) system is to stop during a fire alarm while it is active on a floor.
When the fire alarm is not active on the floor the AC will continue to run.
Test time should be off no longer than 1 hour per test with a 15 min on period between tests.
With the milder condition expected, the impact will be minimal.
The system will return to normal after testing.
Contact
Dale Coulson, Service Technician:
- Call: 0456414605
- Email: dcoulson@agcoombs.com.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.