Toilet Refurbishment Works: Skerman (65)

5 Dec 2022

Please be advised there will be a refurbishment works to the level 4 toilets in Skerman (65) to allow for the much needed cosmetic upgrade to the toilets.

Affected areas

When

  • Commenced: Monday, 5 December 2022
  • Finish: Saturday, 4 March 2023
  • Times: 6:30 am to 5:30 pm

Work details

The refurbishment works will include the following work:

  • Demolition,
  • Electrical
  • Plumbing,
  • Painting
  • Tiling

Project details

The Skerman Level 4 toilets are being upgraded to appear more in line with the recently completed cosmetic upgrades to the level.
Both male and female toilets will be upgraded cosmetically and functionally as well as providing ambulant toilets.

Contact

Alex Openshaw, Project Officer:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.