Fire/HVAC Testing: AIBN (75)

11 Jan 2023

Please be advised there will be disruptions to the air conditioning in AIBN (75) to the whole building to allow for Fire/HVAC interface testing

Affected areas

When

  • Start: Wednesday 18 January 2023
  • Finish: Wednesday 18 January 2023
  • Times: 6:00am to 2:00pm

Work details

The design of the air condition system is to stop during a fire alarm while it is active on a floor. When the fire alarm is not active on the floor the AC will continue to run.
Test time should be off no longer than 1 hour per test with a 15 min on period between tests.

With the milder condition expected, the impact will be minimal. 

The system will return to normal after testing.

Contact

Dale Coulson, Service Technician:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest