Power Shutdown: Hawken Engineering (50)

24 Jan 2023

Please be advised there will be a shutdown in Hawken Engineering (50) to DB-3B to install x 1 RCD for outstanding electrical works.

Affected areas

When

  • Start: Friday 27 Jan 2023
  • Finish: Friday 27 Jan 2023
  • Times: 6:00am to 8:00am

Contact

James Tindall, UGL

Luke Cahill, UGL

 

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest