Please be advised there will be a shutdown in Hawken Engineering (50) to DB-3B to install x 1 RCD for outstanding electrical works.
Affected areas
- Hawken Engineering (50), level 3
When
- Start: Friday 27 Jan 2023
- Finish: Friday 27 Jan 2023
- Times: 6:00am to 8:00am
Contact
James Tindall, UGL
- Call +61 423 404 036
- Email: James.tindall@ugllimited.com
Luke Cahill, UGL
- Call: +61 412 580 078
- Email: Luke.cahill@ugllimited.com
We apologise for the inconvenience this may cause and thank you for your understanding during this time.