Please be advised there will be a water shutdown in General Purpose North 3 (39a) to allow installation of PRV's (pressure reducing valves).
Affected areas
- General Purpose North 3 (39a), whole building
When
- Start: Saturday 21 January 2023
- Finish: Saturday 21 January 2023
- Times: 5:00am to 5:00pm
Work details
Quoted works to install PRV’s (pressure reducing valves).
Contact
Kevin Steytler, Axis Supervisor:
- Call: 0411303549
- Email: kevin@axisms.com.au