Please be advised there are works required on the Long Pocket electrical services network, which will result in several power outages for Cycad (1018).
Affected area
When
Power Outage 1 to Cycad (1018)
- Start: Saturday 11 of February 2023
- Finish: Saturday 11 of February 2023
- Times: 6:00am to 10:00am (times are approximate)
Power Outage 2 to Cycad (1018)
- Start: Saturday 25 of February 2023
- Finish: Saturday 25 February 2023
- Times: 6:00am to 10:00am (times are approximate)
Impacts
During this time there will be no power to the affected building.
Preparation
To prepare for the following power outage please:
- shut down all equipment that may be sensitive to power cycling such as computers.
- plan to avoid accessing fridges and freezers.
Contact
Kevin Park, Project Manager:
- Call: +61 400 009 276
- Email: k.park1@uq.edu.au
If this will severely impact your operations, please contact Kevin Park as soon as possible.
We apologise for the inconvenience this may cause and thank you for your understanding during this time.