Please be advised there will be a brief electrical outage to the whole electrical supply in Forgan Smith (1) east, to allow for the connection of new sub mains from Substation 24.
There will be a brief secondary outage to transition back to the main electrical supply upon completion of the works.
Affected areas
- Forgan Smith (1) east side only
When
- Start: Saturday 25 February 2023
- Finish: Saturday 25 February 2023
- Times: 5:30am to 8:30am
Work details
The outage will facilitate the connection of new electrical submains from Sub 24.
- These works are part of a larger scope of works to replace the Sub 1 low voltage main switchboard.
- A large portion of pre-works have already been completed to ensure the outage is as short as possible.
Project details
Portion of works as part of Sub 1 MSB replacement.
Contact
James Dwyer, Senior Electrical Infrastructure Engineer (P&F):
- Call: +61 457 036 107
- Email: james.dwyer@uq.edu.au
Marcus Gregory, N&P Electrical Contractors:
- Call: +61 449 594 532
- Email: marcus@npcontracting.com.au