Please be advised there will a be shut down to the main electrical supply to level 1 and Level 2 at Acacia (1015) to allow for appropriate building services upgrade to occur.
Affected area
- Acacia (1015), level 2
- Acacia (1015), level 1
When
- Start: Saturday, 4 March 2023
- Finish: Sunday, 5 March 2023
- Times: 5:30am to 5:00pm
Work details
Electrical shutdown to Acacia (1015) will be in place from this Saturday the 4th of March 2023.
The shutdown is required to prepare the plant rooms for appropriate connections, make safe existing work areas and upgrade the existing network accordingly.
Project details
Project will include:
- Upgrades to the HVAC Equipment in Level 1 and Level 2
Contact
Isobel Morris, Principal Project Officer, Infrastructure:
- Call: 0417 239 444
- Email: i.morris@uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.