Power Shutdown: Main Refectory (21b)

10 Mar 2023

Please be advised there will be a power shutdown to the outside lighting and power at the loading dock of Main Refectory (21b)

Affected areas

When

  • Start: Friday 10 March 2023
  • Finish: Friday 10 March 2023
  • Times: 6:00am to 8:00am

Work details

  • There will be an installation of a 20 amp outlet at the loading dock, and installation of a new circuit into DB S.
  • This work is associated to job number DVA-0012335

Contact

James Tindall, UGL

Luke Cahill, UGL:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.

Return to Road and Building works

Latest