Please be advised there will be a water shut off to the buildings affected below to allow for replacement of RPZ devices.
Affected areas
- Cycad (1018), level 2, all floors
- Elkhorn (1024), level 5, room 522 cooling tower (feeds PC2 labs)
When
- Start: Friday 24 March 2023
- Finish: Friday 24 March 2023
- Times: 6:00am to 9:00am
Work details
There will be a replacement of x2 RPZ devices for Elkhorn (1024), and 32mm RPZ device for Cycad (1018).
Contact
Mitchell Rennie, Axis MS Plumber:
- Call: +61 31 177 001
- Email: mitch.rennie@axisms.com.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.