Please be advised there will be a power shutdown to Banksia (1016) to upgrade submains from the main switchboard to the lift motor switchboard (Banksia).
To perform this installation safely, the supply to Banksia (1016) will need to be isolated which affects multiple buildings.
Affected areas
Interruption to all light and power to the following buildings, B1015, B1016, B1016A, B1016B, B1016C, B1017, B1017A, B1017B, B1017C, B1017D, B1017E, B1017F, (2.5 Hr. shutdown, Saturday 22nd April 2023).
When
- Start: Saturday 22 April 2023
- Finish: Saturday 22 April 2023
- Times: 6:00am to 9:00am
Work details
Upgrade submains from main switchboard to lift motor switchboard (Banksia).
This job is associated to job number: QCO-0012622
Contacts
James Tindall, UGL:
- Call: +61 423 404 036
- Email: James.tindall@ugllimited.com
Luke Cahill, UGL:
- Call: +61 412 580 078
- Email: Luke.cahill@ugllimited.com
We apologise for the inconvenience this may cause and thank you for your understanding during this time.