Please be advised there will be a toilet closure to GP South (76) to all male toilets affected for the replacement of the male sewer stack (plumbing system) through all floors.
Affected areas
Rooms 129, 231, 352, 461, 551, 654 plant rooms
When
- Start: Thursday 25 May 2023
- Finish: Monday 29 May 2023
- Times: 5:00am to 4:00pm
Work details
The male sewer stack within GP South will be replaced throughout all floors.
The top 2 levels will be the first to start, and there will be notifications on the entry doors to state the toilets being out of order.
Alternatively, PWD toilets will be available for use during this time.
These works will only affect the male toilets at the moment.
Thursday 25/05/2023
Level 6 & 7 male bathrooms closed (PWD and female in operation)
Between 5:00am and 4:00pm
Saturday 27/05/2023
Levels 2 – 7 male bathrooms closed (level 1 in operation/PWD and female in operation)
Between 5:00am and 4:00pm
Monday 29/05/2023
Levels 4, 5, 6 & 7 male bathrooms closed (PWD and female in operation)
Between 5:00am and 4:00pm
Contact
Kyle Norton, AXIS:
- Call: +61 413 926 867
Rob Dore, Client Facility Manager:
- Call: +61 434 602 556
- Email: r.dore@pf.uq.edu.au
We apologise for the inconvenience this may cause and thank you for your understanding during this time.