Crane Lift: Building 69 & Surrounding Buildings

13 Jul 2023

There will be a crane in place Saturday 15 July on the Northern side of Building 69 to accommodate the required roof replacement of Building 69. This will mean traffic management will be in place to safely divert pedestrians in and around the exclusion zone, whilst works are in operation. Major noisy works will also be completed as well as minor cutting and drilling to allow the removal of steel structure members on the roof for replacement.

Affected Areas

A picture containing tree, outdoor, aerial photography, urban designDescription automatically generated

When

  • Start: Saturday, 15 July 2023
  • Finish: Saturday, 15 July 2023
  • Times: 5:00am to 5:00pm

Work details

 

  • All Level 2 northern entries and exits to Building 69, Building 67 and John Hines will be controlled by the Lead Contractors Traffic Management program
  • Traffic Management will be in place to ensure pedestrian traffic can still pass through when the crane is not in operation
  • No personnel are to enter/exit the building on the north side whilst the crane is in operation, unless in the case of an emergenc
  • Passage through to Phizz from Mansfield Place will be restricted
  • Heavy machinery and vehicles will be travelling through the Northern travel routes as highlighted above
  • Waste will be lifted from the roof of Building 69 and new materials to be lifted on to roof

Project details

 

Project will include:

  • Reinstatement of Steel Structural members for southern roof and reinstall of the roof
  • Removal of waste

Contact

Petar Validzic, Principal, Project Officer (Infrastructure):

We apologise for the inconvenience this may cause and thank you for your understanding during this time.