Please be advised there will be an electrical outage to the LV main switchboard in Sub 11 to allow for the urgent replacement of a failed circuit breaker.

Affected areas

  • 89E / All glass houses and glass house chillers
  • 98C / Pedestal DB on Fred Schonell Drive some street lighting affected
  • 83 / All of Hartley Teakle
  • 98A / All of Carpark 1
  • 98B / All of Carpark 2
  • UQ Sport Playing Field 8
  • Plant Growth Facility / worksite power only (this includes tower crane supply)

When

  • Start: Friday, 21 July 2023
  • Finish: Friday, 21 July 2023
  • Times: 4:30pm to 7:30pm

Work details

Due to the failure in service of an electrical protection device an outage at short notice is required. Unfortunately to repair this fault safely and efficiently a whole switchboard outage is required.

Project details

Unplanned works due to failure of component in service

Contact

James Dwyer, Senior electrical infrastructure engineer:

Jeremy Moynihan, Client Facilities Manager:

Luke Cahill, UGL:

We apologise for the inconvenience this may cause and thank you for your understanding during this time.