Power Shutdown: Gatton Campus, Multiple Locations

3 Nov 2023

There will be a power shut down at the Gatton Campus in the area north of the highway to allow for electrical upgrade works.

Affected Areas

  • Horticulture Buildings and Greenhouses on John Howe Memorial Drive
  • Dwelling No. 26, 27, 28 and 29 on John Howie Memorial Drive
  • Sewerage Treatment Plant
  • Wind Tunnel and Agricultural Chemical Handling & Storage Facility on John Howie Memorial Drive
  • Farms Offices adjacent to the Sewerage Treatment Plant (old CSIRO compound)

When

  • Start: Thursday 9 November 2023
  • Finish: Thursday 9 November 2023
  • Times: 7am – 4pm [For a period of 9hrs]

A map of a farmDescription automatically generated with medium confidence

Work details

These shutdowns are required for the overhead HV replacement and realignment works which are currently underway.

Contact

Casey Fredrickson, Project Manager:

James Dwyer, Senior Electrical Infrastructure Engineer

We apologise for the inconvenience this may cause and thank you for your understanding during this time.