Please be advised there will be a disruption to the air conditioning to the buildings affected below to allow for Fire/HVAC interface testing.
Affected areas
When
- Start: Thursday, 23 March 2023
- Finish: Thursday, 23 March 2023
- Times: 6:00am to 2:00pm
Work details
The design of the air condition system is to shut down during a fire alarm.
Test time should be off no longer than 1 hour per test with a 15 min on period between tests.
With the milder condition expected, the impact will be minimal.
The system will return to normal after testing.
Contact
Dale Coulson, Service Technician:
- Call: +61 456 414 605