Fire/HVAC Testing: Global Exchange Institute (20), & Steele (3)

9 Mar 2023

Please be advised there will be a disruption to the air conditioning to the buildings affected below to allow for Fire/HVAC interface testing.

Affected areas

When

  • Start: Wednesday, 22 March 2023
  • Finish: Wednesday, 22 March 2023
  • Times: 6:00am to 2:00pm

Work details

The design of the air condition system is to shut down during a fire alarm.

Test time should be off no longer than 1 hour per test with a 15 min on period between tests.

With the milder condition expected, the impact will be minimal. 

The system will return to normal after testing.

Contact

Dale Coulson, Service Technician:

Latest